all projects

2009-2011 Private house 2500m² Rublevo-Uspenskoe Chaussee- interior finishing and completion including wooden finishing of the premises and built-in furniture; house maintanance service since 2010, all technical systems including special boiler room equipment, swimming pool, fountain, water treatment, special swimming pool equipment, SPA equipment, wine cellar, cooling ceilings, low current systems, multimedia and others.

2010-2012 Private flat 240m² Moscow city centre - interior fit-out, including wood panelling of the rooms and built-in furniture (subcontract), all technical systems including KNX lighting and room climate control, multimedia.

2011-2014 Private villa 1800m² Skolkovskoe Chaussee - building construction, facade, roofing works, windows, adjoining grounds, building equipment complete, automation LON, DALI, multimedia CRESTRON, interior finishing and finishing, including wooden finishing of the premises and built-in furniture (subcontract), all technical systems, including special equipment of boiler room, swimming pool technology, sauna and hammam, water treatment, boiler system; house maintenance service since 2014.

2015-2016 Private flat 360 m² Moscow city centre - interior fit-out and finishing, including windows, wooden interior fittings and built-in furniture (subcontractor), fireplace, building equipment complete including backup water supply, low voltage systems, multimedia and others.

2015-2016 Private flat 250m² Moscow city centre - finishing works, renovation.

2016-2017 SPA complex 900m² Skolkovskoe Chaussee - construction full cycle, including structures, facade, windows, roof and finishing works, fireplace, outdoor swimming pool, adjoining terraces; building equipment complete, including special swimming pool technology, plunge pool, sauna and hammam; house maintenance service since 2017.

2019 Residential complex 1200m² Moscow city centre - roof renovation, replacement of roof membrane, façade work

2018-2020 Private Spa 450m² Rublevo-Uspenskoe Chaussee - reconstruction of the building, extension of a part of the building, facade and roofing works, windows, interior fittings including wood panelling and built-in furniture, fireplace, complete building equipment, special swimming pool and sauna technology, automation, multimedia and other; house maintenance service since 2021.

2021 Private house 1800m² Skolkovskoe Chaussee - interior finishing and building services (part), built-in furniture; house maintanance service since 2021.

2020-2022 Private house 400m² Moscow region, Korolev - construction full cycle, including construction, facade and roof works, windows, outbuildings, adjoining land, interior finishing and finishing, building equipment complete, including boiler plant, SPA, automation, multimedia.

2021-2022 private penthouse 180m² Moscow city centre - construction of upper floor on the roof including windows and adjoining terraces, interior fit-out and completion, building equipment complete including elevator, except LON, lighting and air conditioning.

2022-2023 Private house 300m² Moscow region, Korolev - interior finishing and completion, including woodwork and built-in furniture, building equipment complete.

2022-2023 Private house 2000m² Moscow west part - interior finishing and completion including built-in furniture and wood panelling, building equipment complete including special swimming pool technology, low-current systems, multimedia, wine cellar system and others; house maintenance service since 2023.

2023- Private flat 180m² Moscow city centre - interior finishing and finishing including wood panelling and built-in furniture, building equipment complete except electrical system and low voltage technology.

2023- private sports club 300m² Moscow west part - interior fit-out and completion including woodwork and built-in furniture, building equipment complete including special systems.